Project Details
4.98 MW AC FUEL CELL POWER PLANT
Engineering, installation, and startup of a 4.98 MW AC Doosan Fuel Cell Power Plant
Location | South Windsor, CT |
Client | Doosan Corp. |
Duration | 1 Year |
Size | 4.98 MW |
Project Summary
Engineering, installation, and startup of a 4.98 MW AC Doosan Fuel Cell Power Plant
Offices
Connecticut Office
Services
Civil Engineering,
Structural Engineering,
Mechanical Engineering,
Electrical Systems
Project Facts
- Engineering, Drafting, 3D Modeling, and Permitting of project of civil, structural, mechanical, and electrical systems
- Installation of site ground grid system
- Installation of underground medium voltage, low voltage, control, and communications conduits and conductors
- Procurement and installation of medium voltage switchgear, pad mount transformers, LV switchboards, grounding transformer, protection relay control cabinets, and parasitic load distribution panels
- Complete acceptance testing per NETA standards for all electrical equipment
- Installation, termination, and acceptance testing of all 15kv MV URD feeders
- Startup, commissioning, and witness testing of protection relays and electrical distribution systems