South Windsor, Connecticut
4.98 MW AC FUEL CELL POWER PLANT

  Project Details

4.98 MW AC FUEL CELL POWER PLANT

Engineering, installation, and startup of a 4.98 MW AC Doosan Fuel Cell Power Plant

Location South Windsor, CT
Client Doosan Corp.
Duration 1 Year
Size 4.98 MW

Project Summary

Engineering, installation, and startup of a 4.98 MW AC Doosan Fuel Cell Power Plant

Offices

Offices

Connecticut Office

Services

Services

Civil Engineering,
Structural Engineering,
Mechanical Engineering,
Electrical Systems

Project Facts

  • Engineering, Drafting, 3D Modeling, and Permitting of project of civil, structural, mechanical, and electrical systems
  • Installation of site ground grid system
  • Installation of underground medium voltage, low voltage, control, and communications conduits and conductors
  • Procurement and installation of medium voltage switchgear, pad mount transformers, LV switchboards, grounding transformer, protection relay control cabinets, and parasitic load distribution panels
  • Complete acceptance testing per NETA standards for all electrical equipment
  • Installation, termination, and acceptance testing of all 15kv MV URD feeders
  • Startup, commissioning, and witness testing of protection relays and electrical distribution systems